Cost of 30 Ton Boiler
30 tons of gas steam boiler equipment cost
The equipment cost of a 30 ton gas fired steam boiler is divided into the boiler body cost, boiler body + auxiliary equipment cost, boiler body + auxiliary equipment + transportation + installation cost. This division is more flexible. If users need auxiliary equipment, transportation or installation, ZOZEN Boiler All can be satisfied.
30 tons of gas steam boiler installation costs
The 30-ton gas-fired steam boiler is generally an assembled or bulk furnace type. According to the national direct installation (fixed at your location) process steel structure direct fee and installation fee + fee collection table, high-altitude operations plus labor costs 10%. The production is about 1900-2300, the installation is 1700-2400, and the corrosion protection is calculated separately. However, it does not include the main material fee and the mechanical entry and exit fees. If the user chooses to install the ZOZEN boiler and install it, its installation quality and price are relatively cost-effective. After all, the installation of its own team of boilers can make users more at ease.
30 tons of gas steam boiler civil construction costs
The civil engineering cost of a 30-ton gas-fired steam boiler is indeed a major project. The user must make a good budget in the early stage of the civil engineering cost. The 30-ton gas boiler civil engineering project budget cost mainly includes the unit project budget cost, design fee, supervision fee, pile foundation testing fee, and development report approval construction cost. These costs are engineering costs directly paid by the construction unit. For boiler rooms that need to be expanded, civil engineering should be left with expansion measures.
LEAVE A MESSAGE
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.